Wednesday, March 11, 2015

Febraury

Deck beams are installed, and primer is being applied to the anchor locker




The engine bed is installed and cut out for the sail drive is finished




Priming the stern area and prepping for cockpit installation




Using a batten to fair the deck beams before the sub deck goes on




Here is the jig used to build the cockpit pan and seats




The cabin house top is built and primed




 A view of the deck beams with openings for the foreward hatch and cabin house




The teak cabin house sides being built




Here is the cabin house mostly completed and ready for installation




 Nice detailing and fit




The companionway entrance




Here is the cockpit pan primed and ready.  It is upside down here




The lead keel with deadwood attached and ready for fairing




The engine is installed and connected to the fuel tank




Another view of the engine installation




The interior getting fit for settees and paint






No comments:

Post a Comment