Nashua's plywood sub deck is down and the cockpit is lowered in for fitting
The curve of the cockpit is seen here looking forward
A worker caulks the perimeter of the aft hatch
The teak waterways get put on
Some beautiful joinery work!
Looking aft at the trimmed out cabin house cutout
A detail of the teak joinery
Here is the bow/anchor locker
The sliding companionway hatch being finished
The fantail being dressed out with teak decking. You can see the cutout hole bottom right which is where our removable radar post will go
The galley being finished. Here we're looking at the icebox and chart table
Teak decking finishing up on the bow
Teak decking looking forward
Another shot of the port side in the galley where the stove will go
No comments:
Post a Comment